| Plant Name, Project Name | Plant Type | System | Function | Service | Country |
|---|---|---|---|---|---|
| ALSTOM Power | Gas turbine control development department GT26 | Process and Control Development Engineer | Engineering Support | Switzerland | |
| ALSTOM Power | Birr Test Center | Series 6 ALSPA (CONTROPLANT™, CONTROGAS™, CONTROSTEAM™) | Test Engineer | System Tests with CONTROGAS on GT26 | Switzerland |
| BAKU | ALSTOM GT8C2 gas turbine supplying process steam to refinery | ADVANT OS500 | Commissioning Engineer | Control system Troubleshooting and process optimization | Azerbaijan |
| BASELL | ALSTOM GT8C gas turbine supplying process steam to steam turbine and chemical industry | PROCONTROL P13 | Commissioning Engineer | Logic modifications and Process re- Commissioning after inspection | Germany |
| BIOC | ALSTOM GT11N2 gas turbines supplying process steam to refinery | ADVANT AS 160OS | I&C Commissioning Lead Advisor | Commissioning Advising | Iran |
| BRAEMAR | ALSTOM GT13E2 single cycle peak load gas turbines | ADVANT Industrial IT | Commissioning Lead Engineer | New Commissioning of gas turbines, balance of plant and DCS | Australia |
| CAMACARI | ALSTOM GT11D5 single cycle gas turbines | ADVANT AS 160OS | Commissioning Engineer | Complete Control System upgrade and process optimization | Brazil |
| DIEMEN 33 | ALSTOM GT13E2 gas turbines in combined cycle power plant | PROCONTROL P13 | Commissioning Lead Engineer | Re- Commissioning of gas turbine | Netherlands |
| Fujairah 2 | ALSTOM GT26 gas turbines in combined cycle power plant | Electricla Systems, GIS | Commissioning Engineer | Commissioning of protection systems for GT and Substation | UAE |
| GfPA, ACS | Process engineering department | Advanced Control System, ACS | Process Design Engineer | Engineering Support, Matlab Simulink | Switzerland |
| KUALA LANGAT | ALSTOM GT13E2 gas turbines in combined cycle power plant | PROCONTROL P13, P14 | Commissioning Engineer | Re- Commissioning of gas turbine | Malaysia |
| MARMARA | ALSTOM GT13E2 gas turbines in combined cycle power plant | ADVANT OS500 | Commissioning Lead Engineer | Re- Commissioning of gas turbine | Turkey |
| MILFORD | ALSTOM GT24 gas turbines in combined cycle power plant | ADVANT OS500 | Commissioning Engineer | New Commissioning of heat recovery steam generator (HRSG) and balance of plant | USA |
| OKPAI NAOC LOT1 | ALSTOM GT13E2 gas turbines in combined cycle power plant | ADVANT OS500, EGATROL | Commissioning Lead Engineer | New Commissioning of gas turbines, Balance of plant (BOP) | Nigeria |
| OKPAI NAOC LOT2 | ALSTOM heat recovery steam generator (HRSG) and steam turbine | ALSPA P320 TURBOTROL, Simatic S7, PCS/DCS | Commissioning Lead Engineer | New Commissioning of heat recovery steam generator (HRSG), steam turbine, balance of plant (BOP), water treatment plant and DCS | Nigeria |
| PROMAG, Az Zour | Single cycle gas turbine power plant | Commissioning Support Engineer | Commissioning and documentation support, train graduated commissiong engineers | Switzerland, Kuwait | |
| RIYADH PP8 | ALSTOM GT11D single cycle gas turbines | Secontic, Decontic, ABB PLC, SCADA | Commissioning Engineer | Complete Control System upgrade and process optimization | Saudi Arabia |
| TKS CSA | ALSTOM/ Thyssen Krupp Steel | LBTU combined cycle power plant within steel complex | Commissioning Manager | COMM for whole combined cycle power plant, incl Blast Furnace Gas Systems | Brazil |